home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / DAILY_1 / 921125.DFC < prev    next >
Text File  |  1992-12-18  |  18KB  |  492 lines

  1. "921125.DFC" (17664 bytes) was created on 11-25-92
  2.  
  3. Enter {V}iew, {X}MODEM, {Y}MODEM, {K}ERMIT, ? for HELP, or {M}enu [V]...
  4.  
  5. 25-Nov-92 Daily File Collection
  6.    These files were added or updated between 24-Nov-92 at 21:00:00 {Central}
  7.                                          and 25-Nov-92 at 21:00:16.
  8.  
  9. =--=--=START=--=--= NASA Spacelink File Name:921124.SHU
  10.  
  11. KSC SHUTTLE STATUS REPORT 11/24/92
  12.  
  13.  
  14.                       SPACE SHUTTLE STATUS REPORT
  15.                       Tuesday, November 24, 1992
  16. George H. Diller
  17. Kennedy Space Center
  18.  
  19.  
  20. Vehicle: OV-103/Space Shuttle Discovery
  21. Current Location: Launch Pad 39-A
  22. Mission: STS-53/DoD   Inclination: 57 degrees
  23. Launch:  Dec. 2  6:59 a.m.  Landing: KSC  Dec. 9  12:53 p.m.
  24. Mission duration: 7 days 5 hours 54 minutes    Crew Size: 5
  25.  
  26. IN WORK TODAY:
  27.  
  28. - launch countdown preparations in LCC Firing Room 1
  29. - external tank purges
  30. - crew compartment closeouts
  31. - aft main engine compartment cleaning and closeouts
  32. - solid rocket booster closeouts
  33. - payload closeouts
  34. - close payload bay doors
  35. - DDU #1 retest
  36.  
  37.  
  38. WORK SCHEDULED:
  39.  
  40. - orbiter aft systems confidence test Wednesday
  41. - install aft compartment flight doors Wednesday night
  42. - pick up countdown 11 a.m. on Sunday for launch on Dec. 2
  43.  
  44.  
  45. WORK COMPLETED:
  46.  
  47. - auxiliary power unit tank pressurization and closeouts
  48. - load mass memory units (MMU)
  49. - main engine sensor calibrations
  50.  
  51. SPECIAL TOPICS: Aft compartment closeout activity today and Wednesday includes
  52. documentation photographs and the removal of access platforms, supplemental
  53. lighting, communications gear, and protective caps and covers.
  54.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  55. =--=--=-END-=--=--=
  56.  
  57. =--=--=START=--=--= NASA Spacelink File Name:921124B.REL
  58.  
  59. 11/24/92:  HUBBLE, GALILEO BRIEFINGS SET FOR DECEMBER 1
  60.  
  61. HQ N92-103/HST,Galileo Briefings
  62.  
  63. Paula Cleggett-Haleim
  64. Headquarters, Washington, D.C.                        November 24, 1992
  65.  
  66.  
  67.  
  68. EDITORS NOTE:  N92-103
  69.  
  70.  
  71.         Hubble Space Telescope astronomers will present the first detailed
  72. images of galaxies as seen more than 4 billion years ago at a briefing on
  73. Tuesday, Dec. 1, at 1 p.m.  EST in the NASA auditorium, 400 Maryland Ave.,
  74. S.W., Washington, D.C.
  75.  
  76.         Serendipitously, the Hubble images also may have revealed the farthest
  77. cluster of galaxies ever seen, located 10 billion light-years away.
  78.  
  79.         Dr.  Alan Dressler, Carnegie Institution, Washington, D.C., will
  80. describe the shapes and evolution of these primordial galaxies.  The Hubble
  81. pictures are sharp enough to distinguish between the various forms of galaxies.
  82.  
  83.         Dr.  Peter Stockman, Acting Director of the Space Telescope Science
  84. Institute, will join host Dr. Stephen Maran, from NASA's Goddard Space Flight
  85. Center, Greenbelt, Md., with veteran panelists Dr. Bruce Margon, Professor of
  86. Astronomy and Chairman of the Department of Astronomy, University of
  87. Washington, Seattle, and Dr. Daniel Weedman, Professor of Astronomy at
  88. Pennsylvania State University, University Park.
  89.  
  90. Galileo Flyby Briefing
  91.  
  92.         Originating from NASA's Jet Propulsion Laboratory, Pasadena, Calif., at
  93. 2 p.m.  EST, project officials will discuss the Galileo Earth flyby to occur on
  94. Dec. 8 and scientific observations of the Earth and moon.
  95.  
  96.         William J. O'Neil, Galileo Project Manager, will describe the flyby
  97. maneuver, the third in Galileo's Venus-Earth-Earth gravity assist trajectory,
  98. and outline plans for the mission to Jupiter.
  99.  
  100.         Dr.  Torrence V. Johnson, Galileo Project Scientist, will discuss
  101. planned scientific activities, which include first-time surveys of the
  102. north-polar regions of the moon.  Galileo also will observe the Earth for a
  103. period of more than a week and will calibrate its instruments for the Jupiter
  104. mission of 1995-1997.
  105.  
  106.         Both briefings will be carried live on NASA Select television, Satcom
  107. F-2R, Transponder 13, 72 degrees west longitude, frequency 3960.0 MHz, audio
  108. 6.8 MHz.
  109.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  110. =--=--=-END-=--=--=
  111.  
  112. =--=--=START=--=--= NASA Spacelink File Name:921125.REL
  113.  
  114. 11/25/92:  TECHNOLOGY TRANSFER PARTNERSHIP INITIATIVE INTRODUCED
  115.  
  116. HQ 92-209/SPI INTRODUCED
  117.  
  118. Barbara Selby
  119. Headquarters, Washington, D.C.          November 25, 1992
  120.  
  121.  
  122.  
  123. RELEASE:  92-209
  124.  
  125.  
  126.      The National Technology Transfer Center (NTTC) has launched an initiative
  127. to foster innovative approaches to transfer and commercialize federally
  128. developed technologies.
  129.  
  130.      The Strategic Partnership Initiative will fund competitively selected
  131. proposals with matching awards of up to $200,000 with the goal of fostering new
  132. and productive technology transfer and commercialization partnerships between
  133. federal laboratories, U.S. industry, research universities and state, local and
  134. non-profit economic development and related organizations.
  135.  
  136.      "This initiative directly addresses the need to better leverage the
  137. nation's investment in federal research and development, and thus strengthen
  138. U.S. economic competitiveness," said Frank E. Penaranda, Director of NASA's
  139. Technology Transfer Program in the Office of Advanced Concepts and Technology.
  140. "I encourage U.S. industry and others to respond to the NTTC's call for
  141. proposals."
  142.  
  143.        The NTTC is sponsored by NASA, in cooperation with other Federal
  144. agencies, to assist federal technology transfer efforts.  The new initiative
  145. will become a key component of the NTTC's overall mission to promote and
  146. facilitate the transfer of federally-developed technologies to American
  147. industry.
  148.  
  149.      The NTTC will accept proposals through Feb. 26, 1993.  To receive the
  150. request for proposals, contact:
  151.  
  152.      Melanie Griffith
  153.      Manager, Strategic Partnership Initiative
  154.      National Technology Transfer Center
  155.      Wheeling Jesuit College
  156.      Wheeling, WV  26003
  157.  
  158.      Telephone:  1-800-678-NTTC 
  159.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  160. =--=--=-END-=--=--=
  161.  
  162. =--=--=START=--=--= NASA Spacelink File Name:921125A.REL
  163.  
  164. 11/24/92:  SPACEWALK ADDED TO SHUTTLE FLIGHT, MORE EXPECTED 
  165.  
  166. 92-210/SPACEWALK ADDED TO SHUTTLE FLIGHT
  167.  
  168.  
  169. Mark Hess
  170. Headquarters, Washington, D.C.                                                
  171.  
  172. November 25, 1992
  173.  
  174. James Hartsfield
  175. Johnson Space Center, Houston
  176.  
  177.  
  178. RELEASE:  92-210
  179.  
  180.  
  181.         With just over 3 years left before construction of Space Station
  182. Freedom begins in Earth orbit, NASA has decided to add spacewalks to upcoming
  183. Shuttle flights when possible, beginning with one during STS-54 in January
  184. 1993.
  185.  
  186.         The spacewalks, or extravehicular activities (EVAs), will fine-tune the
  187. methods of training astronauts for assembly tasks in space and increase the
  188. spacewalk experience levels of astronauts, ground controllers and instructors.
  189.  
  190. EVAs will be added to Shuttle missions only when they can be performed with no
  191. impact on the other objectives and they will be the lowest priority activity on
  192. each mission.
  193.  
  194.         For STS-54, astronauts Greg Harbaugh and Mario Runco, Jr.,will perform
  195. a 5-hour spacewalk evaluating their abilities to move about Endeavour's cargo
  196. bay with and without large objects; closely align large objects; and install
  197. large equipment.  In addition, the tests will provide information on the amount
  198. of time required for various tasks and for the astronauts to become acclimated
  199. to the spacewalk environment.
  200.  
  201.         STS-54 is the only Shuttle flight to have a spacewalk officially added
  202. as part of the new tests.  However, several other 1993 Shuttle flights as well
  203. as many in the following years are being studied as candidates for further
  204. spacewalk additions.
  205.  
  206.         Although spacewalks have been conducted periodically on NASA flights
  207. since the Gemini Program in the mid-1960s, the tasks being performed outside
  208. the spacecraft have become, in general, increasingly more demanding.  The
  209. challenge will continue to increase when Space Station Freedom construction
  210. begins in March 1996.
  211.  
  212.  
  213.         During spacewalks performed on Shuttle mission STS-49 in May to repair
  214. the INTELSAT VI satellite and test Freedom construction techniques, differences
  215. between ground training and actual orbital tasks were noted that can
  216. significantly affect the performance of a spacewalk.  The effect of these
  217. differences could become more pronounced as the duration and complexity of the
  218. spacewalk work grows.
  219.  
  220.         The spacewalk tests to be conducted during the years leading up to
  221. Space Station Freedom construction will help characterize the exact nature of
  222. these differences and assist in developing better training of astronauts for
  223. spacewalking construction work.  They will characterize astronauts' abilities
  224. to move large objects in space and evaluate the amount of time required to
  225. perform various tasks.  Also, they will attempt to identify the physical
  226. demands of various spacewalk jobs and evaluate new training techniques.
  227.  
  228.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  229. =--=--=-END-=--=--=
  230.  
  231. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_41_7.TXT
  232.  
  233. STS-53 TV SKED
  234.  
  235. ***********************************************************************
  236.  
  237.                           NASA SELECT TV SCHEDULE
  238.                                 STS-53/DOD-1
  239.                                  11/24/92
  240.  
  241. ***********************************************************************
  242.  
  243.  
  244. NASA Select programming can be accessed through GE Satcom F2R, transponder 13.
  245. The frequency is 3960 MHz with an orbital position of 72 degrees west
  246. longitude.  This is a full transponder service and will be operational 24 hours
  247. a day.
  248.  
  249. This NASA Select television schedule of mission coverage is available on
  250. Comstore, the mission TV schedule computer bulletin board service.  Call
  251. 713-483-5817, and follow the prompts to access this service.
  252.  
  253. NOTE: On-orbit television will be downlinked at crew descretion.
  254.  
  255.  
  256. -------------------------Sunday, November 29---------------------------
  257.                                L -3 Days
  258.  
  259.                  SUBJECT                  SITE                CST
  260.                  -------                  ----                ---
  261.  
  262.        COUNTDOWN STATUS BRIEFING          KSC                 10:30 AM
  263.  
  264. -------------------------Monday, November 30---------------------------
  265.                                L -2 Days
  266.  
  267.        COUNTDOWN STATUS BRIEFING          KSC                 08:00 AM
  268.  
  269. -------------------------Tuesday, December 1---------------------------
  270.                                L -1 Day
  271.  
  272.        COUNTDOWN STATUS BRIEFING          KSC                 07:30 AM
  273.  
  274.        DOD-1 SECONDARY                    KSC                 08:00 AM
  275.        PAYLOADS BRIEFING
  276.  
  277.        ODERACS PAYLOAD BRIEFING           KSC                 09:00 AM
  278.  
  279.        PRE-LAUNCH PRESS CONFERENCE        KSC                 10:00 AM
  280.  
  281. ------------------------Wednesday, December 2--------------------------
  282.                                  FD 1
  283.  
  284. ORBIT            SUBJECT                  SITE       MET      CST
  285. -----            -------                  ----       ---      ---
  286.        NASA SELECT COVERAGE BEGINS        KSC                 01:00 AM
  287.  
  288. 1      LAUNCH                             KSC     00/00:00    05:59 AM
  289.  
  290. 1      NASA SELECT ORIGINATION            JSC     00/00:04    06:03 AM
  291.        SWITCHED TO JSC
  292.        (time of switch approx.)
  293.  
  294. 1      MECO                                       00/00:08    06:07 AM
  295.  
  296. 1      NASA SELECT ORIGINATION            KSC     00/00:13    06:12 AM
  297.        SWITCHED TO KSC
  298.  
  299. 1      LAUNCH REPLAYS                     KSC     00/00:13    06:12 AM
  300.        (approx. 5 minutes after MECO)
  301.        T=30:00
  302.  
  303. 1      POST LAUNCH PRESS CONFERENCE       KSC     00/01:01    07:00 AM
  304.        T=30:00
  305.  
  306. 2      NASA SELECT ORIGINATION            JSC     00/01:31    07:30 AM
  307.        SWITCHED TO JSC
  308.        (time of switch approx.)
  309.  
  310.      **NORMAL NASA SELECT MISSION COVERAGE**
  311.      **WILL RESUME AFTER DOD-1 OPERATIONS **
  312.  
  313. 4      NASA SELECT ORIGINATION            KSC     00/06:01    12:00 PM
  314.        SWITCHED TO KSC
  315.  
  316. 4      ENGINEERING LAUNCH REPLAYS         KSC     00/06:01    12:00 PM
  317.        T=30:00
  318.  
  319. 4      DOD-1 DEPLOY                               00/06:09    12:08 PM
  320.        (not televised)
  321.  
  322. 5      NASA SELECT ORIGINATION            JSC     00/06:31    12:30 PM
  323.        SWITCH TO JSC
  324.  
  325. 6      Ku BAND ANTENNA DEPLOY                     00/07:40    01:39 PM
  326.        (not televised)
  327.  
  328. 8      CREW SLEEP                                 00/11:00    04:59 PM
  329.  
  330. 8      MISSION STATUS BRIEFING            JSC     00/11:31    05:30 PM
  331.        Lead Flight Director,
  332.        Rob Kelso
  333.  
  334. 10     REPLAY OF FD1 ACTIVITIES           JSC     00/15:01    09:00 PM
  335.  
  336.  
  337.  
  338. -------------------------Thursday, December 3--------------------------
  339.                                  FD 2
  340.  
  341. 13     CREW AWAKE                                 00/19:00    12:59 AM
  342.  
  343. 21     MISSION STATUS BRIEFING            JSC     01/08:01    02:00 PM
  344.        Mission Operations Representative,
  345.        Randy Stone
  346.  
  347. 22     NASA SELECT ORIGINATION            JPL     01/09:01    03:00 PM
  348.        SWITCHED TO JPL
  349.  
  350. 22     ADMINISTRATOR GOLDIN               JPL     01/09:01    03:00 PM
  351.        TOWN MEETING
  352.        (Los Angeles, California)
  353.  
  354. 23     CREW SLEEP                                 01/11:00    04:59 PM
  355.  
  356. 26     NASA SELECT ORIGINATION            JSC     01/14:31    08:30 PM
  357.        SWITCHED TO JSC
  358.  
  359. 26     REPLAY OF FD2 ACTIVITIES           JSC     01/15:01    09:00 PM
  360.  
  361. ---------------------------Friday, December 4--------------------------
  362.                                  FD 3
  363.  
  364. 29     CREW AWAKE                                 01/19:00    12:59 AM
  365.  
  366. 31     ODERACS DEPLOY                             01/21:58    03:57 AM
  367.        (not televised)
  368.  
  369. 37     MISSION STATUS BRIEFING            JSC     02/08:01    02:00 PM
  370.        Mission Operations Representative,
  371.        Randy Stone
  372.  
  373. 40     CREW SLEEP                                 02/12:00    05:59 PM
  374.  
  375. 42     REPLAY OF FD3 ACTIVITIES           JSC     02/15:01    09:00 PM
  376.  
  377. -------------------------Saturday, December 5--------------------------
  378.                                  FD 4
  379.  
  380. 45     CREW AWAKE                                 02/20:00    01:59 AM
  381.  
  382. 53     MISSION STATUS BRIEFING                    03/08:01    02:00 PM
  383.        Mission Operations Representative,
  384.        Randy Stone
  385.  
  386. 56     CREW SLEEP                                 03/13:00    06:59 PM
  387.  
  388. 58     REPLAY OF FD4 ACTIVITIES           JSC     03/15:01    09:00 PM
  389.  
  390.  
  391.  
  392. ---------------------------Sunday, December 6--------------------------
  393.                                  FD 5
  394.  
  395. 62     CREW AWAKE                                 03/21:00    02:59 AM
  396.  
  397. 68     P/TV08 CREW CONFERENCE             TDRE    04/06:15    12:14 PM
  398.        AUDIO/VIDEO CHECK
  399.        T=15:00
  400.  
  401. 68     P/TV08 CREW CONFERENCE             TDRE    04/06:30    12:29 PM
  402.        T=15:00
  403.  
  404. 69     MISSION STATUS BRIEFING            JSC     04/08:01    02:00 PM
  405.        Mission Operations Representative,
  406.        Randy Stone
  407.  
  408. 73     CREW SLEEP                                 04/13:30    07:29 PM
  409.  
  410. 74     REPLAY OF FD5 ACTIVITIES           JSC     04/15:01    09:00 PM
  411.  
  412. ---------------------------Monday, December 7--------------------------
  413.                                  FD 6
  414.  
  415. 78     CREW AWAKE                                 04/21:30    03:29 AM
  416.  
  417. 85     MISSION STATUS BRIEFING            JSC     05/08:01    02:00 PM
  418.        Mission Operations Representative,
  419.        Randy Stone
  420.  
  421. 88     CREW SLEEP                                 05/13:30    07:29 PM
  422.  
  423. 89     REPLAY OF FD6 ACTIVITIES           JSC     05/15:01    09:00 PM
  424.  
  425. --------------------------Tuesday, December 8--------------------------
  426.                                  FD 7
  427.  
  428. 94     CREW AWAKE                                 05/21:30    03:29 AM
  429.  
  430. 98     NASA SELECT ORIGINATION            JPL     06/04:46    10:45 AM
  431.        SWITCHED TO JPL
  432.  
  433. 98     GALILEO/EARTH/MOON FLY-BY          JPL     06/04:46    10:45 AM
  434.        COVERAGE
  435.  
  436. 100    NASA SELECT ORIGINATION            JSC     06/07:46    01:45 PM
  437.        SWITCHED TO JSC
  438.  
  439. 101    MISSION STATUS BRIEFING            JSC     06/08:01    02:00 PM
  440.        Mission Operations Representative,
  441.        Randy Stone
  442.  
  443. 102    Ku BAND ANTENNA STOW                       06/10:00    03:59 PM
  444.        (not televised)
  445.  
  446. 104    CREW SLEEP                                 06/13:30    07:29 PM
  447.  
  448. 105    REPLAY OF FD7 ACTIVITIES           JSC     06/15:01    09:00 PM
  449.  
  450. -------------------------Wednesday, December 9 ------------------------
  451.                                  FD 8
  452.  
  453. 109    CREW AWAKE                                 06/21:30    03:29 AM
  454.  
  455. 114    DE-ORBIT BURN                              07/04:54    10:53 AM
  456.        (not televised)
  457.  
  458. 115    NASA SELECT ORIGINATION            KSC     07/05:24    11:23 AM
  459.        SWITCHED TO KSC
  460.        (time of switch approx.)
  461.  
  462. 115    KSC LANDING                        KSC     07/05:54    11:53 AM
  463.  
  464.        LANDING REPLAYS                    KSC                 TBD
  465.  
  466.        POST LANDING PRESS CONFERENCE      KSC                 TBD
  467.  
  468.        ASTRONAUT DEPARTURE                KSC                 TBD
  469.  
  470.  
  471.  
  472. ***********************************************************************
  473.                          DEFINITION OF TERMS
  474. ***********************************************************************
  475.  
  476. CST:   Central Standard Time
  477. DOD:   Department of Defense
  478. FD:    Flight Day
  479. JPL:   Jet Propulsion Laboratory, Pasadena, California
  480. JSC:   Johnson Space Center
  481. KSC:   Kennedy Space Center
  482. MET:   Mission Elapsed Time.  The time which begins at the moment
  483.        of launch and is read: days/hours:minutes.  Launch=00/00:00
  484. ODERACS:  Orbital Debris Radar Calibration Spheres
  485. P/TV:  Photographic/Television activity
  486. STS:   Space Transportation System
  487. TDRE,W:  Tracking and Data Relay Satellite, East and West longitudes.
  488.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  489. =--=--=-END-=--=--=
  490.  
  491. =--=END OF COLLECTION---COLLECTED 5 FILES---COMPLETED 21:04:23=--=
  492.